Winner: Otto Kruger Electrical (Pty) Ltd -Greendale Super Spar
Design and installation of electrical system, in conjunction with spar designing team and installation and upgrade to a Super Spar electrical system.
The installation of all necessary underground cable sleeves into a substation panel, with new floor standing electrical panels. Additional sub DB’s with necessary inter-leading cables all socket outlet circuits for normal supply and normal socket outlets for UPS supplies, 3 phase power points for all air-conditioning, refrigeration and cold rooms, bakery and commercial kitchen, the installation of overhead cable racking system including specialised power saving LED light fittings and necessary wire ways for computer lines, sound systems, and security cameras.
|
Sigma Quartz & Eezi Quartz materials used for this project have a 15 Year warranty.
|
|
|
ProQuartz requires almost no maintenance. It’s harder than granite and marble, it requires no sealing or resealing and it is exceptionally resistant to scratches and
|
|







