© Master Builders KwaZulu-Natal 2017

The Gates1

WINNER: ACTION ASPHALT - THE GATES - PHASE 2          

The scope of work for this project was the infrastructure development for the residential estate, The Gates which neighbours the school Hilton College. The establishment of roads with storm water throughout the estate from the entrance through to each property was the key focus as principle contractor. The building of a pump house, boundary walls and then the culvert with an English Village feel as a feature into phase 2.